Entity File · The Public Record
Company / LLC
Intech Construction LLC
32 permits
- Records on file
- 32
Built (as contractor)
32 entries
- Issued Jul 6, 2026
1 units
Addition and/or Alteration · FOR LEVEL II ALTERATIONS TO AN EXISTING STRUCTURE ON 18 TH FLOOR. ALTERATIONS TO INCLUDE PARTIAL DEMOLITION AND THE ERECTION OF PARTITION WALLS, PROVIDE FINISHES/FURNISHINGS AND ACCESSIBILITY IMPROVEMENTS THROUGHOUT. FOR USE AS PREVIOUSLY APPROVED. ALL WORK TO BE DONE PER APPROVED PLANS. ***************** SEPARATE PERMITS TO BE OBTAINED FOR ALL OTHER WORK. ******************************************
- Issued Jun 30, 2026
1 units
Addition and/or Alteration · LEVEL II INTERIOR ALTERATIONS (NO CHANGE OF OCCUPANCY) FOR RENOVATIONS TO THIRD FLOOR SPACE WITHIN AN EXISTING MEDICAL OFFICE BUILDING AS PER APPROVED PLANS AND PHC APPROVAL. EXISTING BUILDING FULLY SPRINKLERED. *2018 IEBC REVIEW* **SEPARATE PERMITS REQUIRED FOR ANY MEP OR FIRE SUPPRESSION WORK**
- Issued Jun 30, 2026
Foundation · INSTALLATION OF FOUNDATIONS FOR PROPOSED SCULPTURES AS PER APPROVED PLANS. NO EXCAVATION IN EXCESS OF FIVE FEET. *2018 IBC REVIEW*
- Issued Jun 24, 2026
1 units
Addition and/or Alteration · PARTIAL STRUCTURAL DEMOLITION OF EXISTING EDUCATIONAL FACILITY BUILDING IN PREPARATION FOR PROPOSED ADDITION (SEE PERMIT CP-2026-002637) AS PER APPROVED PLANS. *2018 IEBC REVIEW*
- Issued Jun 12, 2026
1 units
Addition and/or Alteration · LEVEL II INTERIOR ALTERATIONS (NO CHANGE OF OCCUPANCY) FOR RENOVATIONS TO EXISTING 10TH FLOOR OFFICE SPACE IN AN EXISTING HIGH-RISE OFFICE BUILDING AS PER APPROVED PLANS. EXISTING BUILDING FULLY SPRINKLERED. *2021 IEBC REVIEW* **SEPARATE PERMITS REQUIRED FOR ANY MEP OR FIRE SUPPRESSION WORK**
- Issued Jun 10, 2026
Addition and/or Alteration · FOR A LEVEL II INTERIOR AND EXTERIOR ALTERATIONS TO AN EXISTING STRUCTURE. ALL WORK TO BE DONE PER APPROVED PLANS. IF FIELD CONDITIONS VARY CONTACT DESIGN PROFESSIONAL PRIOR TO THE START OF ANY WORK. SEPARATE PERMITS TO BE OBTAINED FOR ALL OTHER WORK.
- Issued Jun 10, 2026
1 units
Addition and/or Alteration · FOR THE FACADE RENOVATION TO AN EXISTING STRUCTURE.
- Issued Jun 2, 2026
Sitework with Onsite Utility Services · FOR SITEWORK AS PER APPROVED PLANS.
- Issued Mar 30, 2026
1 units
Addition and/or Alteration · FOR LEVEL II ALTERATIONS TO AN EXISTING STRUCTURE. ALTERATIONS TO INCLUDE PARTIAL DEMOLITION AND THE ERECTION OF PARTITION WALLS, PROVIDE FINISHES/FURNISHINGS AND ACCESSIBILITY IMPROVEMENTS THROUGHOUT. FOR USE AS PREVIOUSLY APPROVED. ALL WORK TO BE DONE PER APPROVED PLANS. ***************** SEPARATE PERMITS TO BE OBTAINED FOR ALL OTHER WORK. ******************************************
- Issued Mar 27, 2026
1 units
Addition and/or Alteration · FOR LEVEL II ALTERATIONS ON THE FIRST FLOOR OF AN EXISTING BUSINESS OCCUPANCY, ALTERATIONS TO INCLUDE THE ERECTION OF PARTITION WALLS, PROVIDE FINISHES/ FURNISHINGS AND ACCESSIBILITY IMPROVMENTS THROUGHOUT. ALL WORK TO BE DONE PER APPROVED PLANS. IF FIELD CONDITIONS VARY CONTACT DESIGN ENGINEER PRIOR TO THE START OF ANY WORK. SEPARATE PERMITS TO BE OBTAINED FOR ALL OTHER WORK.
- Issued Mar 19, 2026
1 units
Addition and/or Alteration · FOR A LEVEL II INTERIOR ALTERATIONS TO THE 18TH FLOOR SPACE OF AN EXISTING STRUCTURE. ALTERATIONS TO INCLUDE PARTIAL DEMOLITION REMODELING OF RESTROOMS AND THE ERECTION OF PARTITION WALLS, PROVIDE FINISHES/FURNISHINGS THROUGHOUT. ALL WORK TO BE DONE PER APPROVED PLANS. IF FIELD CONDITIONS VARY CONTACT DESIGN PROFESSIONAL PRIOR TO THE START OF ANY WORK. SEPARATE PERMITS TO BE OBTAINED FOR ALL OTHER WORK. 04/22/26 AMENDMENT: Amended Layout changes to the common corridor. The extent and length of c
- Issued Mar 10, 2026
1 units
Addition and/or Alteration · FOR A LEVEL II INTERIOR ALTERATIONS TO AN EXISTING TENANT SPACE USED AS A BUSINESS OCCUPANCY. ALL WORK TO BE DONE PER APPROVED PLANS. PLUMBING WORK TO INCLUDE INTERIOR INSTALLATION OF DRAINAGE, WASTE, VENT, AND WATER SUPPLY FOR LISTED FIXTURES. ALL MATERIALS SHALL BE METALLIC TO ROOF EXTENSION. NO BELOW GRADE PIPING IS PROPOSED. VENTING TO BE DESIGNED AND INSTALLED IN ACCORDANCE WITH SECTION 919 PHILADELPHIA SINGLE STACK VENT SYSTEM. ALL WORK TO BE INSTALLED IN STRICT COMPLIANCE WITH 2018 PPC AN
- Issued Feb 19, 2026
New Construction · FOR THE ERECTION OF AN UNENCLOSED PAVILION. ALL WORK TO BE DONE PER APPROVED PLANS. IF FIELD CONDITIONS VARY CONTACT DESIGN ENGINEER PRIOR TO THE START OF ANY WORK. SEPARATE PERMITS TO BE OBTAINED FOR ALL OTHER WORK.
- Issued Jan 30, 2026
1 units
Addition and/or Alteration · FOR A LEVEL II INERIOR ALTERATIONS TO AN EXISTING TENANT SPACE. FOR A NEW TENANT FIT-OUT AT THE AIRPORT. ALTERATIONS TO INCLUDE THE ERECTION OF PARTITION WALLS, PROVIDE FINISHES/FURNISHINGS, AND ACCESSIBILITY IMPROVEMENTS THROUGHOUT. BUILDING IS FULLY SPRINKLERED. ** ALL WORK TO BE DONE PER APPROVED PLANS. **IF FIELD CONDITIONS VARY CONTACT DESIGN PROFESSIONAL PRIOR TO THE START OF ANY WORK.**MECHANICAL WORK TO BE PROVIDED PER APPROVED PLANS ** ELLECTRICAL REVIEW TO INCLUDE INSTALLATION OF NEW W
- Issued Dec 19, 2025
1 units
Addition and/or Alteration · FOR PARTIAL DEMOLITION AND LEVEL II ALTERATION WITH PARTIAL CHANGE OF OCCUPANCY CLASSIFICATION TO CREATE A LIBRARIES AND CULTURAL EXHIBITS IN AN EXISTING STRUCTURE AS PER APPROVED PLANS. BUILDING TO BE FULLY SPRINKLERED. SEPARATE PERMITS REQUIRED FOR MEP & FP WORK. ASBESTOS REMEDIATION REQUIRED PRIOR TO START OF OTHER WORK. AMENDMENT#1 TO ADD RESTROOM RENOVATION ON LEVEL 1.
- Issued Dec 15, 2025
1 units
New Construction · NEW CONSTRUCTION OF A DETACHED ONE (1) STORY BUILDING FOR USE AS A UTILITY SUBSTATION AS PER APPROVED PLANS. BUILDING TO BE FULLY SPRINKLERED PER NFPA 13. *2018 IBC REVIEW* **SEPARATE PERMITS REQUIRED FOR MEP & FIRE SUPPRESSION WORK**
- Issued Dec 15, 2025
1 units
Addition and/or Alteration · FOR LEVEL II INTERIOR ALTERATIONS TO AN EXISTING STRUCTURE. WORK TO BE LOCATED ON THE 26TH FLOOR OF AN EXISTING STRUCTURE. ALTERATIONS TO INCLUDE THE ERECTION OF PARTITION WALLS, PROVIDE FINISHES/FURNISHINGS, AND ACCESSIBILITY IMPROVEMENTS THROUGHOUT. BUILDING TO BE FULLY SPRINKLERED. ALL WORK TO BE DONE PER APPROVED PLANS. IF FIELD CONDITIONS VARY CONTACT DESIGN PROFESSIONAL PRIOR TO THE START OF ANY WORK. SEPARATE PERMITS TO BE OBTAINED FOR ALL OTHER WORK.
- Issued Dec 9, 2025
1 units
Addition and/or Alteration · FOR LEVEL II ALTERATIONS TO THE 14TH FLOOR LEVEL OF AN EXISTING STRUCTURE. FOR USE AS A BUSINESS OCCUPANCY. ALTERATIONS TO INCLUDE THE ERECTION OF PARTITION WALLS, PROVIDE FINISHES/FURNISHINGS, AND ACCESSIBILITY IMPROVEMENTS THROUGHOUT. BUILDING TO BE FULLY SPRINKLERED. **ALL WORK TO BE DONE PER APPROVED PLANS. IF FIELD CONDITIONS VARY CONTACT DESIGN PROFESSIONAL PRIOR TO THE START OF ANY WORK. SEPARATE PERMITS TO BE OBTAINED FOR ALL OTHER WORK.**
- Issued Dec 9, 2025
1 units
Addition and/or Alteration · FOR A LEVEL II INTERIOR ALTERATIONS TO AN EXISTING STRUCTURE. BUILDING IS FULLY SPRINKLERED. ALL WORK TO BE DONE PER APPROVED PLANS. IF FIELD CONDITIONS VARY CONTACT DESIGN PROFESSIONAL PRIOR TO THE START OF ANY WORK. ** SEPARATE PERMITS TO BE OBTAINED FOR ALL OTHER WORK.**
- Issued Dec 2, 2025
268 units
Addition and/or Alteration · FOR A LEVEL II INTERIOR ALTERATIONS TO AN EXISTING HOTEL. ALTERATIONS TO INCLUDE THE ERECTION OF PARTITION WALLS, PROVIDE FINISHES/FURNISHINGS, AND ACCESSIBILITY IMPROVEMENTS THROUGHOUT. BUILDING IS FULLY SPRINKLERED. **ALL WORK TO BE DONE PER APPROVED PLANS.** IF FIELD CONDITIONS VARY CONTACT DESIGN PROFESSIONAL PRIOR TO THE START OF ANY WORK. **SEPARATE PERMITS TO BE OBTAINED FOR ALL OTHER WORK.**
- Issued Dec 1, 2025
1 units
Addition and/or Alteration · FOR LEVEL II ALTERATIONS TO INCLUDE NEW PARTITIONS, FIXTURES, DOORS, FURNISHINGS, FINISHES TO CREATE EXHIBIT SPACE AND ACCESSORY RETAIL SPACE AS PER APPROVED PLANS. SEPARATE PERMITS REQUIRED FOR MEP AND FIRE SUPPRESSION WORK. *2018 IEBC*
- Issued Nov 17, 2025
1 units
Addition and/or Alteration · FOR LEVEL I ALTERATIONS PER APPROVED PLANS. SEPARATE PERMITS REQUIRED FOR MECHANICAL, ELECTRICAL AND PLUMBING WORK.
- Issued Nov 7, 2025
1 units
Addition and/or Alteration · FOR LEVEL III ALTERATION WITH PARTIAL CHANGE OF OCCUPANCY CLASSIFICATION TO CREATE A LIBRARIES AND CULTURAL EXHIBITS IN AN EXISTING STRUCTURE AS PER APPROVED PLANS. BUILDING TO BE FULLY SPRINKLERED. SEPARATE PERMITS REQUIRED FOR MEP & FP WORK. SEPARATE APPROVAL REQUIRED FROM PA L&I FOR ELEVATOR INSTALLATION. ASBESTOS REMEDIATION REQUIRED PRIOR TO START OF OTHER WORKS.
- Issued Nov 7, 2025
1 units
Addition and/or Alteration · FOR LEVEL III ALTERATION WITH PARTIAL CHANGE OF OCCUPANCY CLASSIFICATION TO CREATE A LIBRARIES AND CULTURAL EXHIBITS IN AN EXISTING STRUCTURE AS PER APPROVED PLANS. BUILDING TO BE FULLY SPRINKLERED. SEPARATE PERMITS REQUIRED FOR MEP & FP WORK. SEPARATE APPROVAL REQUIRED FROM PA L&I FOR ELEVATOR INSTALLATION. Asbestos remediation required prior to start of other works. AMENDMENT APPROVED AS OF 04/30/2026: FOR THE FLOOR LAYOUT CHANGES PER APPROVED AMENDED PLANS.
- Issued Oct 27, 2025
1 units
Addition and/or Alteration · FOR LEVEL II ALTERATIONS TO A PORTION OF THE 1ST, 2ND AND 3RD FLOOR OF AN EXISTING BUILDING USED AS OUTPATIENT FACILITY (GROUP B OCCUPANCY). ALTERATIONS TO INCLUDE THE ERECTION OF PARTITION WALLS, PROVIDE FINISHES/FURNISHINGS AND ACCESSIBILITY IMPROVEMENTS THROUGHOUT. BUILDING IS FULLY SPRINKLERED. **ALL WORK TO BE DONE PER APPROVED PLANS.** IF FIELD CONDITIONS VARY CONTACT DESIGN PROFESSIONAL PRIOR TO THE START OF ANY WORK. ** SEPARATE PERMITS TO BE OBTAINED FOR ALL OTHER WORK.**
- Issued Oct 17, 2025
Addition and/or Alterations · FOR THE INSTALLATION OF REGISTERS, DIFFUSERS, AND APPLIANCES WITH ASSOCIATED DUCTWORK. APPLIANCES TO BE INSTALLED IN ACCORDANCE WITH THE MANUFACTURER’S SPECIFICATIONS. FOR USE AS PREVIOUSLY APPROVED. ALL WORK TO BE DONE PER APPROVED PLANS. IF FIELD CONDITIONS VARY CONTACT DESIGN ENGINEER PRIOR TO THE START OF ANY WORK. SEPARATE PERMITS TO BE OBTAINED FOR ALL OTHER WORK.
- Issued Sep 15, 2025
1 units
Addition and/or Alteration · FOR EXTERIOR ALTERATIONS AND LEVEL I AND LEVEL II INTERIOR ALTERATIONS THROUGHOUT AN EXISTING GROUP R-1 HOTEL TO INCLUDE INTERIOR FINISH UPGRADES TO 249 EXISTING GUESTROOMS AND TO SUITES, MEETING ROOMS, CORRIDORS, HOTEL DINING SPACES, PRE-FUNCTION AREAS, LOBBIES, AND LOUNGES AND CONSTRUCTION OF NEW HOTEL LUGGAGE ROOM. INCLUDES PARTIAL CHANGE IN OCCUPANCY AT THE 1ST FLOOR TO GROUP A-2 PREPARED FOOD SHOP ("GRAB-AND-GO MARKET"). EXISTING BUILDING IS FULLY SPRINKLERED. ALL WORK TO BE DONE PER APPROV
- Issued Sep 8, 2025
1 units
Addition and/or Alteration · FOR THE LEVEL II ALTERATIONS TO AN EXISTING STRUCTURE ON THE 7TH FLOOR SUITE 730. ALTERATIONS TO INCLUDE THE ERECTION OF PARTITION WALLS, PROVIDE FINISHES/FURNISHINGS AND ACCESSIBILITY IMPROVEMENTS THROUGHOUT. FOR USE AS PREVIOUSLY APPROVED. ALL WORK TO BE DONE PER APPROVED PLANS. ***************** SEPARATE PERMITS TO BE OBTAINED FOR ALL OTHER WORK. ******************************************
- Issued Aug 18, 2025
1 units
Addition and/or Alteration · FOR LEVEL II ALTERATIONS WITH NO CHANGE IN OCCUPANCY. SEPARATE PERMITS REQUIRED FOR MECHANICAL, ELECTRICAL, PLUMBING AND FIRE SUPPRESSION WORK.
- Issued Aug 12, 2025
1 units
Addition and/or Alteration · LEVEL II INTERIOR ALTERATIONS FOR FIT-OUT OF 1ST FLOOR LAB SUITE 107 IN EXISTING HIGHER EDUCATIONAL RESEARCH FACILITY AS PER APPROVED PLANS. EXISTING BUILDING FULLY SPRINKLERED. FOR USE AS A BUSINESS OCCUPANCY. *2018 IEBC REVIEW* **SEPARATE PERMITS REQUIRED FOR ANY MEP OR FIRE SUPPRESSION WORK**
- Issued Jul 25, 2025
1 units
Addition and/or Alteration · FOR LEVEL II INTERIOR ALTERATIONS FOR THE REMOVATION ON THE SECOND FLOOR OF AN EXISTING OUTPATIENT FACILITY. ALTERATIONS TO INCLUDE THE ERECTION OF PARTITION WALLS, PROVIDE FINISHES/ FURNISHINGS AND ACCESSIBILITY IMPROVMENTS THROUGHOUT. ALL WORK TO BE DONE PER APPROVED PLANS. IF FIELD CONDITIONS VARY CONTACT DESIGN ENGINEER PRIOR TO THE START OF ANY WORK. SEPARATE PERMITS TO BE OBTAINED FOR ALL OTHER WORK.
- Issued Jul 23, 2025
1 units
Addition and/or Alteration · FOR LEVEL II INTERIOR ALTERATIONS WITHOUT A CHANGE IN USE & OCCUPANCY CLASSIFICATION TO A GROUP B PREPARED FOOD SHOP AT THE 1ST FLOOR. EXISTING BUILDING IS FULLY SPRINKLERED. ALL WORK TO BE DONE PER APPROVED PLANS AND IN ACCORDANCE WITH 2018 IEBC. SEPARATE PERMITS REQUIRED FOR MECHANICAL, ELECTRICAL, PLUMBING, AND FIRE SUPPRESSION WORK.
Track this owner
We'll flag their next deal, permit, or filing — usually before the neighbors know.
Entities are grouped by a normalized name from the public record; a separate legal entity per building is common, so some portfolios span several related names. Sources: Phila. Dept. of Records (deeds), L&I (permits & violations), Dept. of Revenue (tax delinquencies), reflecting the record as of our last weekly ingest. Verify independently before relying on it.
Last generated July 15, 2026.