Entity File · The Public Record
Company / LLC
Palman Electric INC
40 permits
- Records on file
- 40
Built (as contractor)
40 entries
- Issued Jul 1, 2026
Addition and/or Alteration · New theater lighting, controls, power & dimming panels. All work per approved plans NEC 2017 ***NO FIRE ALARM ON THIS PERMIT***
- Issued Jun 8, 2026
Addition and/or Alteration · Provide updated electrical panel, wiring devices, lighting. The service panel is 100amps
- Issued Jun 5, 2026
Addition and/or Alteration · Furnish and install new lighting fixtures and associated hardware. Power to new rooftop units are included. No new fire alarm devices. Power to new fence.
- Issued Jun 4, 2026
Addition and/or Alteration · Install new panel LR116C from existing panel LR116, receptacles, lighting, lighting control, and power for HVAC as per 2017 NEC. Excludes fire alarm.
- Issued Jun 3, 2026
Addition and/or Alteration · Install 800 amp service with grounding. Install receptacles, lighting, lighting control, power for HVAC equipment, empty conduits for data, panels, and feeders as per 2017 NEC. Install fire alarm as per 2016 NFPA 72.
- Issued Jun 2, 2026
Addition and/or Alteration · Furnish and install a new light fixture, wall pack, and outlet. Disconnect and relocate an outlet
- Issued May 26, 2026
Addition and/or Alteration · Install receptacles, lighting, lighting control, power for HVAC & Kitchen equipment, replace existing wiring devices with new. Fire Alarm is existing in all units. Adding FA devices All work per approved plans NEC 2017
- Issued May 15, 2026
Addition and/or Alteration · Existing HVAC units to be disconnected. Furnish and install new conduit and cables, new transformers, panels, and associated mounting hardware. MECHANICAL PERMIT# MP-2026-002109. No building permit.
- Issued May 12, 2026
Addition and/or Alteration · Electric sub-panel, lighting, lighting controls, wiring devices, fire alarm, HVAC & general equipment power wiring. all fed from existing service on EP-2025-011275, all work per approved plans NEC 2017
- Issued May 7, 2026
Addition and/or Alteration · Per the historical commission: lighting replacement in-kind. One for One replacement of exterior facade lighting. Provide new lighting controls. Project exterior electric only All work per approved plans NEC 2017
- Issued May 7, 2026
New Construction · Install telecom wiring , cameras, circuits for lighting ,lighting controls. ALL WORK IS TO BE DONE ACCORDING TO APPROVED DRAWINGS-2017 NEC.
- Issued Apr 21, 2026
Addition and/or Alteration · Provide power wiring for duct heaters and rooftop unit(s). Work includes installation of feeders and/or branch circuits, disconnecting means, conduit, conductors, supports, terminations, and grounding/bonding as required. Coordinate electrical connections with mechanical equipment requirements, including proper overcurrent protection and equipment ratings. All work shall be performed in accordance with the 2017 NEC and per approved plans.
- Issued Apr 14, 2026
Addition and/or Alteration · Install wiring, receptacle outlets, lighting fixtures, and lighting control systems throughout the space. Provide electrical power for HVAC and kitchen equipment, including all required branch circuits, wiring, terminations, grounding, and overcurrent protection. Replace existing wiring devices with new devices as required. The fire alarm system is existing in all units; scope includes installation of additional fire alarm devices in the HVI unit only, including all associated wiring, terminatio
- Issued Apr 14, 2026
Addition and/or Alteration · Install two (2) 20-amp branch circuits to provide power to rooftop exhaust fans and one (1) 30-amp branch circuit to provide power to a rooftop damper. Work includes all required wiring, conduit, supports, disconnecting means, terminations, grounding, and overcurrent protection. All work shall be performed in accordance with the 2017 NEC and per approved plans.
- Issued Mar 24, 2026
Addition and/or Alteration · Furnish and install a fire alarm system for a take-out restaurant. Work includes installation of fire alarm control equipment (as required), initiating devices, notification appliances, wiring, terminations, programming, and testing. All devices shall be properly interconnected to provide required detection and occupant notification. All work shall be performed in accordance with 2016 NFPA 72, the 2017 NEC and per approved plans.
- Issued Mar 19, 2026
Addition and/or Alteration · Install receptacles, lighting, lighting control, power for HVAC equipment, fire alarm system, empty conduits for data, panels, feeders, Nurse call .ALL WORK IS TO BE DONE ACCORDING TO APPROVED DRAWINGS-2017 NEC,2016 NFPA-72.
- Issued Mar 19, 2026
Addition and/or Alteration · Demo lighting and receptacles. Install new lighting, receptacles, utilizing existing circuitry as per 2017 NEC.
- Issued Mar 19, 2026
Addition and/or Alteration · Replace existing lighting fixtures with new. Furnish and install new cables and conductors. Furnish and install new panel and transformer. Power to new rooftop units, duct detection ,. Install 400A service .ALL WORK IS TO BE DONE ACCORDING TO APPROVED DRAWINGS-2017 NEC.
- Issued Mar 16, 2026
Addition and/or Alteration · Demo abandoned Motor Control center. Power new Mechanical Equipment (air compressor, dryer, electronic drain). ALL WORK IS TO BE DONE ACCORDING TO APPROVED DRAWINGS-2017 NEC.
- Issued Mar 10, 2026
Addition and/or Alteration · Electrical Permit for combo CP-2026-000780
- Issued Mar 5, 2026
Addition and/or Alteration · Furnish and install new disconnect switches and mounting hardware with new wires. We will install (2) new chargers. From existing MDP & EV Panel . ALL WOR
- Issued Mar 2, 2026
Addition and/or Alteration · Installation of New lighting and lighting sensors. Installation of new speakers. Replacement of strobes 1 for one. changing color from red to white. Temporary power and lighting NEC 2017
- Issued Feb 27, 2026
Addition and/or Alteration · Provide power wiring for new HVAC equipment. There is no work other than electrical and mechanical work. Our portion of electrical work is wiring Elliott Lewis HVAC supplied equipment. There’s no general construction work on this project. MECHANICAL PERMIT# MP-2026-000471 We are not fishing or installing wiremold. We are installing 3/4”-EMT conduit above a drop ceiling with branch circuit wiring from the electric panel to the (2) new Water Source Heat Pump units. ***NO FIRE ALARM WORK ON THIS P
- Issued Feb 12, 2026
Addition and/or Alteration · Exterior work only. Install receptacles, lighting, lighting control, power feeds. All work to be done according to the 2017 NEC and per approved plans.
- Issued Feb 3, 2026
Addition and/or Alteration · Furnish and install one (1) 600-amp subpanel and one (1) 400-amp subpanel, complete with all required feeders, grounding, and bonding. Install all associated electrical wiring, including lighting fixtures, lighting controls, switches, exit signs, emergency lighting, and receptacle outlets. Provide and install branch circuit wiring for kitchen equipment and HVAC systems in accordance with manufacturer requirements. Install telecommunications wiring, including pathways and cabling as required. A
- Issued Jan 13, 2026
Addition and/or Alteration · Install lighting and empty conduits for future service upgrade
- Issued Jan 6, 2026
Addition and/or Alteration · The installation of receptacle outlets, interior and exterior lighting, and lighting control devices. Electrical power shall be provided for HVAC equipment, including all required branch circuits. The work also includes the installation of a complete fire alarm system. In addition, empty conduits for future data and communication systems shall be installed, along with electrical panels and feeders necessary to support the proposed electrical distribution system. All work shall be done accordin
- Issued Dec 30, 2025
Addition and/or Alteration · “Install receptacle outlets, lighting, lighting controls, power for HVAC equipment, a fire alarm system, empty conduits for data, panelboards, and feeders. All work to be done according to the 2017 NEC, 2016 NFPA 27 and per approved plans.
- Issued Dec 1, 2025
Addition and/or Alteration · New panels with feeders, branch circuit wiring, lighting, receptacles, lighting control, HVAC power wiring. New fire alarm system. **No phone, data, security, audio, video on this permit** ALL WORK IS TO BE DONE ACCORDING TO APPROVED DRAWINGS-2017 NEC,2016 NFPA-72.
- Issued Nov 6, 2025
Addition and/or Alteration · Install new feeders for AHU's. Remove existing MCC's relocate existing feeders to new distribution panel boards. Install new fire alarm devices onto exiting fire alarm system. Sub for HVAC contractor Permit #MP-2025-005338. ALL WORK IS TO BE DONE ACCORDING TO APPROVED DRAWINGS-2017 NEC,2016 NFPA-72.
- Issued Nov 5, 2025
Addition and/or Alteration · Amend Permit 12/30/2025 - Change of Agency to United Inspection Agency Electrical Permit for combo CP-2025-003381
- Issued Oct 21, 2025
Addition and/or Alteration · Electric panels, general lighting, emergency lighting, lighting controls, receptacles, Kitchen and HVAC equipment power wiring. Fire alarm system (conduit pathways for security, data, audio, video. ALL WORK IS TO BE DONE ACCORDING TO APPROVED DRAWINGS-2017 NEC,2018 PHILA FIRE CODE.
- Issued Oct 5, 2025
Addition and/or Alteration · Electrical Service, panels, lighting, receptacles, mechanical power, and empty conduits for low voltage (phone/data/security) as per 2017 NEC. Install fire alarm as per 2016 NFPA 72.
- Issued Sep 24, 2025
Addition and/or Alteration · Remove (506) Hanwha solar panels and replace with (418) new panels. No roof racking modifications or any building modifications, PV replacement scope on existing racking. Existing system installed under the 2008 NEC
- Issued Sep 18, 2025
Addition and/or Alteration · Install new lighting fixtures and switches. Install new outlets, replace defective outlets, test and label all power circuits. The panels are existing. Furnish and install new fire alarm devices. ALL WORK IS TO BE DONE ACCORDING TO APPROVED DRAWINGS-2017 NEC,2018 IEBC.
- Issued Sep 17, 2025
Addition and/or Alteration · Install one (1) light fixture, eight (8) receptacles, power for (1) EF
- Issued Aug 5, 2025
Addition and/or Alteration · Install 6 Fire Alarm Pre-action panels and heat detectors on Floors 7, 13, 14 . ALL WORK IS TO BE DONE ACCORDING TO APPROVED DRAWINGS -2017 NEC,2016 NFPA-72,2018 PHILA FIRE CODE.
- Issued Jul 28, 2025
Addition and/or Alteration · Furnish and install a new Voice Evac FA system, install new cabling and devices. System will be tied into the Main Building FA system. ALL WORK IS TO BE DONE ACCORDING TO APPROVED DRAWINGS-2017 NEC,2016 NFPA-72.
- Issued Jul 25, 2025
Addition and/or Alteration · Furnish and install new lighting fixtures, new receptacles, new conduit and wire, new panels and breakers. Power connection to new HVAC equipment is included. New fire alarm devices will be furnished and installed. ALL WORK IS TO BE DONE ACCORDING TO APPROVED DRAWINGS-2017 NEC,2016 NFPA-72,2018 PHILA FIRE CODE.
- Issued Jul 23, 2025
Addition and/or Alteration · Disconnect and replace existing lighting fixtures and switches. Furnish and install a new motorized shades system. Provide power to new desk. Test and label new devices. The panels are existing. Installation shall comply with 2017 NEC.
Track this owner
We'll flag their next deal, permit, or filing — usually before the neighbors know.
Entities are grouped by a normalized name from the public record; a separate legal entity per building is common, so some portfolios span several related names. Sources: Phila. Dept. of Records (deeds), L&I (permits & violations), Dept. of Revenue (tax delinquencies), reflecting the record as of our last weekly ingest. Verify independently before relying on it.
Last generated August 1, 2026.