- Issued Jun 30, 2026
Addition and/or Alterations · FOR THE INSTALLATION OF REGISTERS, DIFFUSERS, AND APPLIANCES WITH ASSOCIATED DUCTWORK. APPLIANCES TO BE INSTALLED IN ACCORDANCE WITH MANUFACTURER'S SPECIFICATIONS. ALL WORK TO BE DONE PER APPROVED PLANS. IF FIELD CONDITIONS VARY CONTACT DESIGN ENGINEER PRIOR TO THE START OF ANY WORK. SEPARATE PERMITS REQUIRED FOR ALL OTHER WORK.
- Issued Jun 25, 2026
Alterations · New fixtures w piping, 1 WC 1 LAV- 3 KS ALL WORK PERFORMED PER 2018 PPC AND EZ STANDARD
- Issued Jun 17, 2026
Alterations · Replace one electric water cooler, replace one KS *WITHOUT PIPING*
- Issued Jun 15, 2026
Addition and/or Alterations · FOR THE INSTALLATION OF REGISTERS, DIFFUSERS, WITH ASSOCIATED DUCTWORK TO BE INSTALLED IN ACCORDANCE WITH THE MANUFACTURER’S SPECIFICATIONS. FOR USE AS PREVIOUSLY APPROVED. ALL WORK TO BE DONE PER APPROVED PLANS. IF FIELD CONDITIONS VARY CONTACT DESIGN ENGINEER PRIOR TO THE START OF ANY WORK. SEPARATE PERMITS TO BE OBTAINED FOR ALL OTHER WORK.
- Issued May 15, 2026
Alterations · ALTERATIONS TO MEDICAL BUILDING. REPLACEMENT/INSTALLATION OF NEW SPD UNITS AND INSTALLATION/REPLACEMENT OF FLOOR SINKS FOR DISPOSAL OF WASTE FROM UNITS. CONNECTION OF SPD UNITS TO RO SYSTEM AND COMMPRESSED AIR SYSTEM. NEW RO SYSTEM SUPPLIED BY OWNER TO BE INSTALLED WITH REQUIRED BACKFLOW PREVENTERS. ALL WORK TO BE PERFORMED UNDER STRICT COMPLIANCE WITH 2018 PPC AND APPROVED PLANS.
- Issued May 7, 2026
Addition and/or Alterations · FOR THE INSTALLATION OF REGISTERS, DIFFUSERS, AND APPLIANCES WITH ASSOCIATED DUCTWORK. APPLIANCES TO BE INSTALLED IN ACCORDANCE WITH THE MANUFACTURER’S SPECIFICATIONS. ALL WORK TO BE DONE PER APPROVED PLANS. IF FIELD CONDITIONS VARY CONTACT DESIGN ENGINEER PRIOR TO THE START OF ANY WORK. SEPARATE PERMITS REQUIRED FOR ALL OTHER WORK.
- Issued Apr 22, 2026
Alterations · ALERATIONS TO HOSPITAL. INTERIOR INSTALLATION OF DRAINAGE, WASTE, VENT, AND WATER SUPPLY FOR LISTED FIXTURES. ALL MATERIALS SHALL BE METALLIC TO ROOF EXTENSION. VENTING TO BE DESIGNED AND INSTALLED IN ACCORDANCE WITH SECTION 919 PHILADELPHIA SINGLE STACK VENT SYSTEM. ALL WORK TO BE INSTALLED IN STRICT COMPLIANCE WITH 2018 PPC AND APPROVED PLANS
- Issued Apr 16, 2026
Alterations · ALTERATIONS TO EXISTING LAB. INTERIOR INSTALLATION OF DRAINAGE, WASTE, VENT, AND WATER SUPPLY FOR LISTED FIXTURES. ALL MATERIALS SHALL BE METALLIC TO ROOF EXTENSION. VENTING TO BE DESIGNED AND INSTALLED IN ACCORDANCE WITH SECTION 919 PHILADELPHIA SINGLE STACK VENT SYSTEM. ALL WORK TO BE INSTALLED IN STRICT COMPLIANCE WITH 2018 PPC AND APPROVED PLANS
- Issued Apr 15, 2026
Alterations · INSTALL 2 WATER HEATERS with 2 storage tanks and new mixing valve.
- Issued Apr 13, 2026
Addition and/or Alterations · FOR THE INSTALLATION OF A NEW DUCTLESS HVAC SYSTEM AS PER APPROVED PLANS. SEPARATE PERMIT REQUIRED FOR ELECTRICAL, PLUMBING, FIRE SUPPRESSION.
- Issued Apr 8, 2026
Alterations · ALTERATIONS TO EXISTING COMMERCIAL BUILDING. INTERIOR INSTALLATION OF DRAINAGE, WASTE, VENT, AND WATER SUPPLY FOR LISTED FIXTURES. ALL MATERIALS SHALL BE METALLIC TO ROOF EXTENSION. VENTING TO BE DESIGNED AND INSTALLED IN ACCORDANCE WITH SECTION 919 PHILADELPHIA SINGLE STACK VENT SYSTEM. ALL WORK TO BE INSTALLED IN STRICT COMPLIANCE WITH 2018 PPC AND APPROVED PLANS
- Issued Apr 8, 2026
Addition and/or Alterations · FOR THE INSTALLATION OF REGISTERS, DIFFUSERS, AND APPLIANCES WITH ASSOCIATED DUCTWORK. APPLIANCES TO BE INSTALLED IN ACCORDANCE WITH THE MANUFACTURER’S SPECIFICATIONS. FOR USE AS PREVIOUSLY APPROVED. ALL WORK TO BE DONE PER APPROVED PLANS. IF FIELD CONDITIONS VARY CONTACT DESIGN ENGINEER PRIOR TO THE START OF ANY WORK. SEPARATE PERMITS TO BE OBTAINED FOR ALL OTHER WORK.
- Issued Apr 8, 2026
Addition and/or Alterations · FOR THE INSTALLATION OF AN APPLIANCE TO BE INSTALLED IN ACCORDANCE WITH THE MANUFACTURER’S SPECIFICATIONS. FOR USE AS PREVIOUSLY APPROVED. ALL WORK TO BE DONE PER APPROVED PLANS. IF FIELD CONDITIONS VARY CONTACT DESIGN ENGINEER PRIOR TO THE START OF ANY WORK. SEPARATE PERMITS TO BE OBTAINED FOR ALL OTHER WORK.
- Issued Apr 7, 2026
Addition and/or Alterations · FOR THE INSTALLATION OF REGISTERS, DIFFUSERS AND APPLIANCES WITH ASSOCIATED DUCTWORK. APPLIANCES TO BE INSTALLED IN ACCORDANCE WITH THE MANUFACTURER’S SPECIFICATIONS. ALL WORK TO BE DONE PER APPROVED PLANS. IF FIELD CONDITIONS VARY CONTACT DESIGN ENGINEER PRIOR TO THE START OF ANY WORK.
- Issued Apr 6, 2026
Addition and/or Alterations · FOR THE INSTALLATION OF REGISTERS, DIFFUSERS AND APPLIANCES WITH ASSOCIATED DUCTWORK. APPLIANCES TO BE INSTALLED IN ACCORDANCE WITH THE MANUFACTURER’S SPECIFICATIONS. ALL WORK TO BE DONE PER APPROVED PLANS AND PADOH APPROVAL. IF FIELD CONDITIONS VARY CONTACT DESIGN ENGINEER PRIOR TO THE START OF ANY WORK.
- Issued Mar 30, 2026
Addition and/or Alterations · FOR ALTERATIONS TO AN EXISTING HVAC SYSTEM TO INSTALL NEW GRDs AND ASSOCIATED DUCTWORK. ALL WORK TO BE DONE PER APPROVED PLANS AND IN ACCORDANCE WITH 2018 IMC AND PHC AND PA DOH APPROVALS. SEPARATE PERMITS TO BE OBTAINED FOR ALL OTHER WORK. SEE CP-2025-006270 FOR ASSOCIATED BUILDING PERMIT.
- Issued Mar 30, 2026
Addition and/or Alterations · DEMOLITION AND INSTALLATION OF MECHANICAL EQUIPMENT IN AN EXISTING HOSPITAL BUILDING (FOUNDERS BUILDING) INCLUDING ASSOCIATED PIPING, VALVES, INSULATION AND SUPPORTS AS PER APPROVED PLANS AND PA DOH APPROVALS. *2018 IEBC REVIEW*
- Issued Mar 17, 2026
Addition and/or Alterations · FOR THE INSTALLATION OF REGISTERS, DIFFUSERS AND APPLIANCES WITH ASSOCIATED DUCTWORK. APPLIANCES TO BE INSTALLED IN ACCORDANCE WITH THE MANUFACTURER’S SPECIFICATIONS. ALL WORK TO BE DONE PER APPROVED PLANS. IF FIELD CONDITIONS VARY CONTACT DESIGN ENGINEER PRIOR TO THE START OF ANY WORK.
- Issued Feb 19, 2026
1 units
Addition and/or Alteration · FOR LEVEL II ALTERATIONS TO INCLUDE EXTERIOR RAMP, NEW PARTITIONS, DOORS, FIXTURES, FURNISHING, EXTERIOR STAIRS, AS PER APPROVED PLANS. SEPARATE PERMITS REQUIRED FOR ANY MEP WORK. *2018 IEBC*
- Issued Feb 9, 2026
Addition and/or Alterations · FOR A MECHANICAL SYSTEM YUPGRADE TO A PORTION OF AN EXISTING STRUCTURE. APPLIANCES TO BE INSTALLED IN ACCORDANCE WITH THE MANUFACTURER’S SPECIFICATIONS. ALL WORK TO BE DONE PER APPROVED PLANS. IF FIELD CONDITIONS VARY CONTACT DESIGN ENGINEER PRIOR TO THE START OF ANY WORK.
- Issued Feb 5, 2026
Addition and/or Alterations · FOR THE REPLACEMENT OF SEVEN (7) ROOFTOP COOLING TOWERS AS PER APPROVED PLANS AND IN ACCORDANCE WITH 2018 IMC. SEE BUILDING PERMIT CP-2025-006422 FOR ASSOCIATED STRUCTURAL WORK.
- Issued Feb 5, 2026
Alterations · Add 3 sinks, waste and water piping to existing space.
- Issued Feb 4, 2026
Addition and/or Alterations · FOR THE RELOCATION OF DIFFUSERS AND INSTALLATION OF ONE (1) DIFFUSER WITH ASSOCIATED DUCTWORK. ALL WORK TO BE DONE PER APPROVED PLANS. IF FIELD CONDITIONS VARY CONTACT DESIGN ENGINEER PRIOR TO THE START OF ANY WORK. SEPARATE PERMITS REQUIRED FOR ALL OTHER WORK.
- Issued Feb 4, 2026
1 units
Addition and/or Alteration · FOR THE REPLACEMENT OF EXISTING COOLING TOWNER ON THE ROOFTOP. ALL WORK TO BE DONE PER APPROVED PLANS. IF FIELD CONDITIONS VARY CONTACT DESIGN ENGINEER PRIOR TO THE START OF ANY WORK. SEPARATE PERMITS TO BE OBTAINED FOR ALL OTHER WORK. **SEPARATE PERMITS REQUIRED FOR ELECTRICAL, MECHANICAL, & PLUMBING WORK**
- Issued Feb 4, 2026
Addition and/or Alterations · FOR INSTALLATION OF HVAC APPLIANCES, EQUIPMENT, DUCTWORK AND REGISTERS/DIFFUSERS PER APPROVED PLANS AND MANUFACTURER'S SPECIFICATIONS.
- Issued Jan 30, 2026
Addition and/or Alterations · FOR THE INSTALLATION OF REGISTERS, DIFFUSERS TO BE INSTALLED IN ACCORDANCE WITH THE MANUFACTURER’S SPECIFICATIONS. FOR USE AS PREVIOUSLY APPROVED. ALL WORK TO BE DONE PER APPROVED PLANS. IF FIELD CONDITIONS VARY CONTACT DESIGN ENGINEER PRIOR TO THE START OF ANY WORK. SEPARATE PERMITS TO BE OBTAINED FOR ALL OTHER WORK.
- Issued Jan 26, 2026
Alterations · Install new floor drains for Bistro's, new water lines, water heater's and 2 sinks
- Issued Jan 26, 2026
Alterations · Refresh, to Dulles 6th floor. Fixtures, traps and faucets
- Issued Jan 15, 2026
New Construction or Additions · For minor construction work at the subject property in accordance with all applicable provisions of the Philadelphia Code, all references codes and standards, and the attached EZ Standard, where included. Deviation from this standard shall result in permit revocation. A separate permit from the Philadelphia Department of Streets is required for any sidewalk and street closures. All means of pedestrian protection required at the site in accordance with the Philadelphia Building Code Chapter 33 sh
- Issued Jan 14, 2026
New Construction or Additions · Install new storm water piping for new team store addition 5 roof drains
- Issued Jan 13, 2026
Addition and/or Alterations · FOR THE INSTALLATION OF REGISTERS, DIFFUSERS AND APPLIANCES WITH ASSOCIATED DUCTWORK. APPLIANCES TO BE INSTALLED IN ACCORDANCE WITH THE MANUFACTURER’S SPECIFICATIONS. ALL WORK TO BE DONE PER APPROVED PLANS. IF FIELD CONDITIONS VARY CONTACT DESIGN ENGINEER PRIOR TO THE START OF ANY WORK.
- Issued Jan 9, 2026
Alterations · Level Hall of Fame Club Suite renovations Fixture replacement in gang restrooms
- Issued Jan 7, 2026
Alterations · For minor construction work at the subject property in accordance with all applicable provisions of the Philadelphia Code, all references codes and standards, and the attached EZ Standard, where included. Deviation from this standard shall result in permit revocation. A separate permit from the Philadelphia Department of Streets is required for any sidewalk and street closures. All means of pedestrian protection required at the site in accordance with the Philadelphia Building Code Chapter 33 sh
- Issued Dec 30, 2025
Addition and/or Alterations · FOR INSTALLATION OF HVAC APPLIANCES, EQUIPMENT, DUCTWORK AND REGISTERS/DIFFUSERS PER APPROVED PLANS AND MANUFACTURER'S SPECIFICATIONS.
- Issued Dec 2, 2025
Addition and/or Alterations · FOR INSTALLATION OF HVAC DUCTWORK AND REGISTERS/DIFFUSERS PER APPROVED PLANS.
- Issued Nov 20, 2025
Addition and/or Alterations · FOR THE INSTALLATION OF REGISTERS, DIFFUSERS, AND APPLIANCES WITH ASSOCIATED DUCTWORK. APPLIANCES TO BE INSTALLED IN ACCORDANCE WITH MANUFACTURER'S SPECIFICATIONS. ALL WORK TO BE DONE PER APPROVED PLANS. IF FIELD CONDITIONS VARY CONTACT DESIGN ENGINEER PRIOR TO THE START OF ANY WORK. SEPARATE PERMITS REQUIRED FOR ALL OTHER WORK. DOH APPROVAL UNDER ID # 200801-02 AND DWG INDEX # H-25-0897.
- Issued Oct 28, 2025
Addition and/or Alterations · FOR THE INSTALLATION OF REGISTERS, DIFFUSERS AND APPLIANCES WITH ASSOCIATED DUCTWORK. APPLIANCES TO BE INSTALLED IN ACCORDANCE WITH THE MANUFACTURER’S SPECIFICATIONS. ALL WORK TO BE DONE PER APPROVED PLANS. IF FIELD CONDITIONS VARY CONTACT DESIGN ENGINEER PRIOR TO THE START OF ANY WORK. SEPARATE PERMITS REQUIRED FOR ALL OTHER WORK.
- Issued Oct 17, 2025
Addition and/or Alterations · FOR THE INSTALLATION OF REGISTERS, DIFFUSERS, AND APPLIANCES WITH ASSOCIATED DUCTWORK. APPLIANCES TO BE INSTALLED IN ACCORDANCE WITH THE MANUFACTURER’S SPECIFICATIONS. FOR USE AS PREVIOUSLY APPROVED. ALL WORK TO BE DONE PER APPROVED PLANS. IF FIELD CONDITIONS VARY CONTACT DESIGN ENGINEER PRIOR TO THE START OF ANY WORK. SEPARATE PERMITS TO BE OBTAINED FOR ALL OTHER WORK.
- Issued Oct 3, 2025
Addition and/or Alterations · FOR THE INSTALLATION OF A HYDRONIC (STEAM-HEATED) APPLIANCE WITH ASSOCIATED REGISTERS, DIFFUSERS, EXHAUST APPLIANCES, HIGH-PRESSURE STEAM/CONDENSATE PIPING & DUCTWORK. APPLIANCES TO BE INSTALLED IN ACCORDANCE WITH THE MANUFACTURER’S SPECIFICATIONS. ALL WORK TO BE DONE PER APPROVED PLANS. IF FIELD CONDITIONS VARY CONTACT DESIGN ENGINEER PRIOR TO THE START OF ANY WORK. SEPARATE PERMITS REQUIRED FOR ALL OTHER WORK, INCLUDING RELATED PLUMBING.
- Issued Sep 11, 2025
Alterations · Replace Domestic Water heater and storage tank
- Issued Aug 21, 2025
Alterations · REPLACE 8" BACKFLOW DEVICE. Make PWD corrections in incoming water room.
- Issued Aug 18, 2025
Alterations · Remove and replace fixtures on 9th floor men's and ladies toilet rooms Fixture only, no piping
- Issued Aug 15, 2025
Alterations · Add new Lab sink, eye wash & replace two floor drains. 4 FIXTURES.
- Issued Aug 14, 2025
New Construction or Additions · Installation of standard Plumbing fixtures, water piping, Grease waste piping, sanitary piping. Install mop basins(18), indirect waste stand pipe and piping, electric water cooler (12), eye wash (19), kitchen equipment(40), clinical service sinks(4),floor drains and floor sinks. This work is only for Fit-out work on floors A-. ALL WORK TO BE PERFORMED IN STRICT COMPLIANCE WITH 2018 PPC AND APPROVED PLANS. ALL MECHANICAL, ELECTRICAL, AND FIRE SUPPRESSION WORK SHALL BE APPLIED FOR UNDER THEIR DES
- Issued Jul 29, 2025
New Construction or Additions · Hook up of sanitary and water on pre-piped classroom trailer, only making connection for pre-piped modular
- Issued Jul 28, 2025
Addition and/or Alterations · FOR THE INSTALLATION OF A NEW HVAC SYSTEMS, ASSOCIATED DUCT WORK, VAVS, ROOFTOP UNITS, DUCTLESS SYSTEMS, AND REGISTERS/DIFFUSERS AS PER APPROVED PLANS. SEPARATE PERMIT REQUIRED FOR ELECTRICAL, PLUMBING, FIRE SUPPRESSION.
- Issued Jul 24, 2025
Alterations · INTERIOR RENOVATIONS TO PHARMACY SPACE. INTERIOR INSTALLATION OF DRAINAGE, WASTE, VENT, AND WATER SUPPLY FOR LISTED FIXTURES CONNECTING TO EXISTING METALLIC PIPING. ALL PIPE UTILIZED SHALL BE METALLIC PIPING. VENTING TO BE DESIGNED AND INSTALLED IN ACCORDANCE WITH SECTION 919 PHILADELPHIA SINGLE STACK VENT SYSTEM. ALL WORK TO BE PERFORMED IN STRICT COMPLIANCE WITH 2018 PPC AND APPROVED PLANS.
- Issued Jul 24, 2025
New Construction or Additions · Install Water Connection form existing building to modular trailer connection Install 4" sanitary from existing sanitary on property to new modular trailer. Provide main under trailer to connect existing sanitary drops from fixtures in modular trailers.
- Issued Jul 14, 2025
Addition and/or Alterations · INSTALLATION OF HVAC SYSTEM FOR KITCHEN AREA TO INCLUDE INSTALLATION OF THREE (3) UL 710 LISTED COMMERCIAL KITCHEN EXHAUST HOODS WITH SUPPLY/EXHAUST TIE-IN TO ONE (1) RETURN AIR FAN, ONE (1) EXHAUST FAN & ONE (1) RETURN AIR FAN AND ONE (1) EXHAUST FAN FOR DISHWASHING EQUIPMENT AND ALL ASSOCIATED RETURN/EXHAUST DUCTWORK.***SEPARATE PERMIT SHALL BE REQUIRED FOR INSTALLATION OF AN APPROVED AUTOMATIC FIRE SUPRESSION SYSTEM***
- Issued Jul 10, 2025
Alterations · INTERIOR RENOVATIONS TO PEARLMAN CENTER SECOND FLOOR. SCOPE OF WORK TO INCLUDE DEMOLISH AND CAP EXISTING FIXTURES AND DRAINAGE, WASTE, VENT, AND WATER SUPPLY FOR NEW FIXTURES LISTED CONNECTING TO EXISTING METALLIC PIPING. ALL MATERIALS UTILIZED SHALL BE METALLIC. VENTING TO BE DESIGNED AND INSTALLED IN ACCORDANCE WITH SECTION 919 PHILADELPHIA SINGLE STACK VENT SYSTEM. ALL WORK SHALL BE PERFORMED IN STRICT COMPLIANCE WITH 2018 PPC AND APPROVED PLANS.
- Issued Jul 10, 2025
Alterations · INTERIOR RENOVATION TO EXISITING BUILDING. INSTALLATION OF 5 NEW SINKS AND ALL ASSOCIATED PIPING REQUIRED. MATERIALS SHALL BE 100% METALLIC PIPING WITH APPROVED JOINTS. ALL WORK TO BE PERFORMED IN COMPLIANCE WITH 2018 PPC AND APPROVED PLANS.
Track this owner
We'll flag their next deal, permit, or filing — usually before the neighbors know.
Entities are grouped by a normalized name from the public record; a separate legal entity per building is common, so some portfolios span several related names. Sources: Phila. Dept. of Records (deeds), L&I (permits & violations), Dept. of Revenue (tax delinquencies), reflecting the record as of our last weekly ingest. Verify independently before relying on it.
Last generated August 1, 2026.