Entity File · The Public Record
Company / LLC
Lor-mar Mechanical Services LLC
70 permits
- Records on file
- 70
Built (as contractor)
70 entries
- Issued Jul 6, 2026
Addition and/or Alterations · FOR A MECHANICAL ALTERATION TO ACCOMMODATE THE 7TH FLOOR OF AN EXISTING STRUCTURE. ALL WORK TO BE DONE PER APPROVED PLANS. IF FIELD CONDITIONS VARY CONTACT DESIGN ENGINEER PRIOR TO THE START OF ANY WORK.
- Issued Jun 9, 2026
Alterations · Partial renovation to lab is school. . INTERIOR INSTALLATION OF DRAINAGE, WASTE, VENT, AND WATER SUPPLY FOR LISTED FIXTURES. ALL MATERIALS SHALL BE METALLIC TO ROOF EXTENSION. VENTING TO BE DESIGNED AND INSTALLED IN ACCORDANCE WITH SECTION 919 PHILADELPHIA SINGLE STACK VENT SYSTEM. ALL WORK TO BE INSTALLED IN STRICT COMPLIANCE WITH 2018 PPC AND APPROVED PLANS
- Issued Jun 9, 2026
Addition and/or Alterations · Mechanical / Fuel Gas Permit for combo CP-2026-001709
- Issued Jun 9, 2026
Addition and/or Alterations · FOR THE INSTALLATION OF REGISTERS, DIFFUSERS, AND APPLIANCES WITH ASSOCIATED DUCTWORK. APPLIANCES TO BE INSTALLED IN ACCORDANCE WITH MANUFACTURER'S SPECIFICATIONS. ALL WORK TO BE DONE PER APPROVED PLANS. IF FIELD CONDITIONS VARY CONTACT DESIGN ENGINEER PRIOR TO THE START OF ANY WORK. SEPARATE PERMITS REQUIRED FOR ALL OTHER WORK.
- Issued Jun 8, 2026
Alterations · Cut and cap existing domestic water lines serving (1) sink
- Issued Jun 5, 2026
Alterations · Plumbing installed to the 2018 Philadelphia PLUMBING code Sec 919. All piping to be metallic. • Furnish and install [6] Water Closets [6] Lavatories, [1] Uinal, [4] ELectric Water Coolers, [2] SINKS • Provide labor and material to extend from existing sanitary, vent, and domestic cold water to new fixtures as shown.
- Issued Jun 3, 2026
Addition and/or Alterations · FOR A MECHANICAL ALTERATION TO ACCOMMODATE A PORTION OF THE SECOND FLOOR LEVEL OF AN EXISTING STRUCTURE. ALL WORK TO BE DONE PER APPROVED PLANS. IF FIELD CONDITIONS VARY CONTACT DESIGN ENGINEER PRIOR TO THE START OF ANY WORK.
- Issued May 26, 2026
Alterations · • Provide labor and materials to remove fixtures in each apartment. All debris is to be removed from site by others. • Furnish and install [15] Water Closets, [15] Lavatories, [15] Bathtubs, [15] Kitchen Sinks *WITHOUT PIPING*
- Issued May 20, 2026
Addition and/or Alterations · EZ PERMIT DUCTWORK & WARM-AIR APPLIANCES - For the installation of New Ductwork, Registers/Grilles/Diffusers, and Warm-Air Appliances as per attached standards. Deviations from these standards require submission of construction and site plans. Relocate [1] thermostat, relocate[6] diffusers, and provide air balance report.
- Issued May 20, 2026
Alterations · ALTERATIONS TENANT FIT-OUT FOR RESTAURANT. INTERIOR INSTALLATION OF DRAINAGE, WASTE, VENT, AND WATER SUPPLY FOR LISTED FIXTURES. ALL MATERIALS SHALL BE METALLIC TO ROOF EXTENSION. VENTING TO BE DESIGNED AND INSTALLED IN ACCORDANCE WITH SECTION 919 PHILADELPHIA SINGLE STACK VENT SYSTEM. ALL WORK TO BE INSTALLED IN STRICT COMPLIANCE WITH 2018 PPC AND APPROVED PLANS • Furnish and install [3] Water Closet, [3] Lavatories, [1] Grease Interceptor, [1] Electric Water Heater, [9] Floor Drains, [7] Flo
- Issued May 19, 2026
Alterations · ALTERATIONS TO RESTROOMS IN SCHOOL. INTERIOR INSTALLATION OF DRAINAGE, WASTE, VENT, AND WATER SUPPLY FOR LISTED FIXTURES. ALL MATERIALS SHALL BE METALLIC TO ROOF EXTENSION. VENTING TO BE DESIGNED AND INSTALLED IN ACCORDANCE WITH SECTION 919 PHILADELPHIA SINGLE STACK VENT SYSTEM. ALL WORK TO BE INSTALLED IN STRICT COMPLIANCE WITH 2018 PPC AND APPROVED PLANS Provide labor and materials to extend form existing sanitary and domestic water as shown on drawings. Furnish and install (7) wash closets,
- Issued Apr 20, 2026
Addition and/or Alterations · FOR THE INSTALLATION OF TWO COOLING TOWERS TO BE INSTALLED IN ACCORDANCE WITH THE MANUFACTURER’S SPECIFICATIONS. FOR USE AS PREVIOUSLY APPROVED. ALL WORK TO BE DONE PER APPROVED PLANS. IF FIELD CONDITIONS VARY CONTACT DESIGN ENGINEER PRIOR TO THE START OF ANY WORK. SEPARATE PERMITS TO BE OBTAINED FOR ALL OTHER WORK.
- Issued Apr 7, 2026
Alterations · Furnish and install below slab sanitary and vent piping for future tenant in Retail Space. • Furnish and install [1] Tenant Sub Meter on Domestic Cold-Water Main, [1] Floor Cleanout, [1] Wall Cleanout ALL WORK PERFOMRED PER 2018 PPC AND EZ STANDARD
- Issued Apr 7, 2026
Addition and/or Alterations · ***2021 IFGC REVIEW** FOR THE INSTALLATION OF A FUEL GAS PIPING SYSTEM. ALL WORK TO BE DONE PER APPROVED PLANS. IF FIELD CONDITIONS VARY CONTACT DESIGN ENGINEER PRIOR TO THE START OF ANY WORK. SEPARATE PERMITS REQUIRED FOR ALL OTHER WORK. *NO MECHANICAL SYSTEMS ON THIS PERMIT*
- Issued Apr 6, 2026
Addition and/or Alterations · FOR THE INSTALLATION OF REGISTERS, DIFFUSERS, AND APPLIANCES WITH ASSOCIATED DUCTWORK. APPLIANCES TO BE INSTALLED IN ACCORDANCE WITH THE MANUFACTURER’S SPECIFICATIONS. FOR USE AS PREVIOUSLY APPROVED. ALL WORK TO BE DONE PER APPROVED PLANS. IF FIELD CONDITIONS VARY CONTACT DESIGN ENGINEER PRIOR TO THE START OF ANY WORK. SEPARATE PERMITS TO BE OBTAINED FOR ALL OTHER WORK.
- Issued Mar 19, 2026
Alterations · Provide labor and materials to extend from existing sanitary and domestic water for new fixtures Furnish and install [3] Eyewash Stations with Mixing Valve , [1] Floor Drian and [3] Open Site/Cup Drains.
- Issued Mar 18, 2026
Addition and/or Alterations · Mechanical / Fuel Gas Permit for combo CP-2025-005486
- Issued Mar 10, 2026
Alterations · Provide labor and material to replace [1] sink at Pantry Area. *WITHOUT PIPING*
- Issued Feb 24, 2026
Addition and/or Alterations · FOR THE INSTALLATION OF REGISTERS, DIFFUSERS, AND APPLIANCES WITH ASSOCIATED DUCTWORK AT THE EIGHTH FLOOR LEVEL. APPLIANCES TO BE INSTALLED IN ACCORDANCE WITH MANUFACTURER'S SPECIFICATIONS. ALL WORK TO BE DONE PER APPROVED PLANS. IF FIELD CONDITIONS VARY CONTACT DESIGN ENGINEER PRIOR TO THE START OF ANY WORK. SEPARATE PERMITS REQUIRED FOR ALL OTHER WORK.
- Issued Feb 18, 2026
Alterations · ALTERATIONS TO EXISTING OFFICE. INTERIOR INSTALLATION OF DRAINAGE, WASTE, VENT, AND WATER SUPPLY FOR LISTED FIXTURES. ALL MATERIALS SHALL BE METALLIC. VENTING TO BE DESIGNED AND INSTALLED IN ACCORDANCE WITH SECTION 919 PHILADELPHIA SINGLE STACK VENT SYSTEM. ALL WORK TO BE INSTALLED IN STRICT COMPLIANCE WITH 2018 PPC AND APPROVED PLANS
- Issued Feb 6, 2026
Addition and/or Alterations · EZ PERMIT DUCTWORK & WARM-AIR APPLIANCES - For the installation of New Ductwork, Registers/Grilles/Diffusers, and Warm-Air Appliances as per attached standards. Deviations from these standards require submission of construction and site plans. Relocate 14 exhaust grilles only, then provide air balance report.
- Issued Feb 4, 2026
Addition and/or Alterations · FOR THE INSTALLATION OF HVAC APPLIANCES THROUGHOUT A SIX (6) FAMILY DWELLING (630 N PERTH PLACE) AS PER APPROVED PLANS AND IN ACCORDANCE WITH 2018 IMC. SEPARATE PERMITS TO BE OBTAINED FOR ALL OTHER WORK. SEE CP-2025-003245 FOR ASSOCIATED BUILDING PERMIT.
- Issued Feb 4, 2026
Addition and/or Alterations · FOR THE INSTALLATION OF HVAC APPLIANCES THROUGHOUT A SIX (6) FAMILY DWELLING (600 N PERTH PLACE) AS PER APPROVED PLANS AND IN ACCORDANCE WITH 2018 IMC. SEPARATE PERMITS TO BE OBTAINED FOR ALL OTHER WORK. SEE CP-2025-003238 FOR ASSOCIATED BUILDING PERMIT.
- Issued Feb 2, 2026
Addition and/or Alterations · FOR THE INSTALLATION OF HVAC APPLIANCES, EQUIPMENT, DUCTWORK AND REGISTERS/DIFFUSERS TO THE 5TH AND 6TH FLOOR OF AN EXISTING STRUCTURE PER APPROVED PLANS AND MANUFACTURER'S SPECIFICATIONS. *2018 IMC REVIEW*
- Issued Jan 29, 2026
Addition and/or Alterations · FOR A NEW MECHANICAL WORK TO ACCOMMODATE AN EXISTING STRUCTURE. **ALL WORK TO BE DONE PER APPROVED PLANS. **IF FIELD CONDITIONS VARY CONTACT DESIGN ENGINEER PRIOR TO THE START OF ANY WORK. **
- Issued Jan 29, 2026
Addition and/or Alterations · FOR THE INSTALLATION OF HVAC APPLIANCES THROUGHOUT A SIX (6) FAMILY DWELLING (610 N PERTH PLACE) AS PER APPROVED PLANS AND IN ACCORDANCE WITH 2018 IMC. SEPARATE PERMITS TO BE OBTAINED FOR ALL OTHER WORK. SEE CP-2025-003243 FOR ASSOCIATED BUILDING PERMIT.
- Issued Jan 22, 2026
Alterations · Provide labor and materials to disconnect [1] sink. Provide labor and materials re install [1] Sink into new countertop ALL WORK PERFORMED IN STRICT COMPLIANCE WITH 2018 PPC AND EZ PLUMBING STANDARD.
- Issued Jan 15, 2026
Addition and/or Alterations · EZ PERMIT DUCTWORK & WARM-AIR APPLIANCES - For the installation of New Ductwork, Registers/Grilles/Diffusers, and Warm-Air Appliances as per attached standards. Deviations from these standards require submission of construction and site plans. Relocate [1] VAV box, [1] thermostat, [7] diffusers, and provide air balancing.
- Issued Jan 7, 2026
Alterations · Furnish and install [1] sink with 6 -gallon hot water heater - Connect to existing Sanitary, vent and domestic cold water lines. 2 FIXTURES.
- Issued Dec 30, 2025
Alterations · • Furnish and install [2] Water CLosets, [2] Lavatories, [22] Exam Room Sinks, [3] Breakroom Sinks. • Provide labor and material to extend from existing sanitary, vent and domestic water as shown. ********* installed to the 2018 Philadelphia Plumbing Code section 919(Philadelphia Single Stack/venting System****************
- Issued Dec 29, 2025
Alterations · • Provide labor and material to disconnect [8] water closets, [7] lavatories, [3] urinals on the 6th Floor Core Restroom • Provide labor and material to disconnect [6] water closets, [5] lavatories, [2] urinals on 56th Floor Core Restroom
- Issued Dec 22, 2025
Addition and/or Alterations · FOR THE INSTALLATION OF REGISTERS, DIFFUSERS, AND APPLIANCES WITH ASSOCIATED DUCTWORK. APPLIANCES TO BE INSTALLED IN ACCORDANCE WITH THE MANUFACTURER’S SPECIFICATIONS. ALL WORK TO BE DONE PER APPROVED PLANS. IF FIELD CONDITIONS VARY CONTACT DESIGN ENGINEER PRIOR TO THE START OF ANY WORK. SEPARATE PERMITS REQUIRED FOR ALL OTHER WORK.
- Issued Dec 17, 2025
Addition and/or Alterations · FOR THE INSTALLATION OF REGISTERS, DIFFUSERS, AND APPLIANCES WITH ASSOCIATED DUCTWORK. APPLIANCES TO BE INSTALLED IN ACCORDANCE WITH MANUFACTURER'S SPECIFICATIONS. ALL WORK TO BE DONE PER APPROVED PLANS. IF FIELD CONDITIONS VARY CONTACT DESIGN ENGINEER PRIOR TO THE START OF ANY WORK. SEPARATE PERMITS REQUIRED FOR ALL OTHER WORK.
- Issued Dec 8, 2025
Alterations · • Provide labor and material to disconnect [1] sink. All are to be dropped to the floor for removal by others. • Furnish and install [1] Sink • Provide labor and materials to extend from existing sanitary, vent and domestic water to new sink location
- Issued Dec 3, 2025
Addition and/or Alterations · FOR ALTERATION TO THE EXISTING HVAC SYSTEM TO ACCOMMONDATE NEW OFFICE LAYOUT AS PER APPROVED PLANS.
- Issued Nov 26, 2025
Alterations · Provide labor and material to extend from nearest sanitary, vent and domestic cold water, provide labor and material to relocate (1) water filter, ice maker and water dispenser, and furnish and install (1) new open site drain
- Issued Nov 19, 2025
Addition and/or Alterations · FOR MECHANICAL SYSTEM UPGRADE **ALL WORK TO BE DONE PER APPROVED PLANS.** IF FIELD CONDITIONS VARY CONTACT DESIGN ENGINEER PRIOR TO THE START OF ANY WORK.** SEPARATE PERMITS REQUIRED FOR ALL OTHER WORK.**
- Issued Nov 19, 2025
Addition and/or Alterations · FOR THE INSTALLATION OF REGISTERS, DIFFUSERS, AND APPLIANCES WITH ASSOCIATED DUCTWORK. APPLIANCES TO BE INSTALLED IN ACCORDANCE WITH MANUFACTURER'S SPECIFICATIONS. ALL WORK TO BE DONE PER APPROVED PLANS. IF FIELD CONDITIONS VARY CONTACT DESIGN ENGINEER PRIOR TO THE START OF ANY WORK. SEPARATE PERMITS REQUIRED FOR ALL OTHER WORK.
- Issued Nov 19, 2025
Alterations · Provide labor and material to connect to existing sanitary, vent and domestic water. Furnish and install (1) kitchen sink and (1) water heater.
- Issued Nov 19, 2025
Addition and/or Alterations · FOR A MECHANICAL SYSTEM UPGRADE TO ACCOMMODATE A PORTION OF THE 2ND FLOOR OF AN EXISTING STRUCTURE. ALL WORK TO BE DONE PER APPROVED PLANS. **IF FIELD CONDITIONS VARY CONTACT DESIGN ENGINEER PRIOR TO THE START OF ANY WORK.** SEPARATE PERMITS REQUIRED FOR ALL OTHER WORK.**
- Issued Nov 17, 2025
Addition and/or Alterations · FOR THE INSTALLATION OF HVAC APPLIANCES, EQUIPMENT, DUCTWORK AND REGISTERS/DIFFUSERS PER APPROVED PLANS AND MANUFACTURER'S SPECIFICATIONS. *2018 IMC REVIEW*
- Issued Nov 12, 2025
Alterations · Provide labor and material to relocate [1] Electric Water Cooler with Bottle Filler - Furnish and install [1] Kitchen Sink - Provide labor and material to extend from existing sanitary, vent and domestic water to new fixture locations.
- Issued Oct 31, 2025
Addition and/or Alterations · FOR THE INSTALLATION OF REGISTERS, DIFFUSERS, AND APPLIANCES WITH ASSOCIATED DUCTWORK. APPLIANCES TO BE INSTALLED IN ACCORDANCE WITH MANUFACTURER'S SPECIFICATIONS. ALL WORK TO BE DONE PER APPROVED PLANS. IF FIELD CONDITIONS VARY CONTACT DESIGN ENGINEER PRIOR TO THE START OF ANY WORK. SEPARATE PERMITS REQUIRED FOR ALL OTHER WORK.
- Issued Oct 28, 2025
Addition and/or Alterations · FOR ALTERATION TO THE EXISTING HVAC SYSTEM TO ACCOMMODATE NEW OFFICE LAYOUT AS PER APPROVED PLANS.
- Issued Oct 24, 2025
Addition and/or Alterations · FOR THE INSTALLATION OF REGISTERS, DIFFUSERS, AND APPLIANCES WITH ASSOCIATED DUCTWORK TO INCLUDE THE INSTALLATION OF A TYPE 1 COMMERCIAL KITCHEN HOOD (11'-0") AND TYPE II COMMERCIAL KITCHEN HOOD (8'-0) ASSOCIATED DUCTWORK, FANS AS PER APPROVED PLANS. IF FIELD CONDITIONS VARY CONTACT DESIGN ENGINEER PRIOR TO THE START OF ANY WORK. SEPARATE PERMITS TO BE OBTAINED FOR ALL OTHER WORK. SEPARATE PERMITS REQUIRED FOR ELECTRICAL AND FIRE SUPPRESSION WORK. **IMC 2018**
- Issued Oct 15, 2025
Addition and/or Alterations · FOR THE INSTALLATION OF HVAC APPLIANCES, EQUIPMENT, DUCTWORK AND REGISTERS/DIFFUSERS TO THE 8TH FLOOR OF AN EXISTING STRUCTURE PER APPROVED PLANS AND MANUFACTURER'S SPECIFICATIONS. *2018 IMC REVIEW*
- Issued Oct 15, 2025
New Construction or Additions · Plumbing Permit (Interior) for combo CP-2025-004036
- Issued Oct 15, 2025
New Construction · Mechanical / Fuel Gas Permit for combo CP-2025-004036
- Issued Oct 15, 2025
Alterations · • Demo existing 500-gallon tank and required piping. • Furnish and install two (2) new 200-gallon hot water storage tanks.
- Issued Oct 14, 2025
Addition and/or Alterations · FOR THE INSTALLATION OF REGISTERS, DIFFUSERS, APPLIANCES WITH ASSOCIATED DUCTWORK, AND ONE (1) 7' - 0" TYPE I HOOD WITH EXHAUST FAN AND A MAKE UP AIR FAN WITH ASSOCIATED DUCTWORK. APPLIANCES TO BE INSTALLED IN ACCORDANCE WITH MANUFACTURER'S SPECIFICATIONS. ALL WORK TO BE DONE PER APPROVED PLANS. IF FIELD CONDITIONS VARY CONTACT DESIGN ENGINEER PRIOR TO THE START OF ANY WORK. SEPARATE PERMITS REQUIRED FOR ALL OTHER WORK.
- Issued Oct 13, 2025
Alterations · • Furnish and install [2] Electric Water Coolers, [1] Lavatory, [2] Pantry Sinks, [1] Water Closet, [2] Floor Drains, [1] Floor Sink, [2] Electric Water HEaters • Provide labor and materials to extend from existing sanitary, vent and domestic cold-water mains as shown.
- Issued Oct 3, 2025
Alterations · Provide labor and materials to disconnect existing plumbing fixtures and equipment in kitchen area. • Furnish and install [2] Floor Drains, [6] Floor Sinks and [5] Kitchen Sinks ? [1] FCO. Provide labor and materials to extend from existing sanitary, vent, domestic water hot & cold water, gas and grease waste as needed. • Provide labor and materials to make final connection to new kitchen equipment as needed. All is to be supplied and set in place by others. • Existing Water Heaters are to rema
- Issued Sep 23, 2025
Addition and/or Alterations · FOR RELOCATION AND INSTALLATION OF REGISTERS AS PER APPROVED PLANS TO ACCOMMODATE NEW LAYOUT.
- Issued Sep 23, 2025
Addition and/or Alterations · EZ PERMIT DUCTWORK & WARM-AIR APPLIANCES - For the installation of New Ductwork, Registers/Grilles/Diffusers, and Warm-Air Appliances as per attached standards. Deviations from these standards require submission of construction and site plans. Relocate [5] diffusers and provide air balancing in suite 300
- Issued Sep 19, 2025
Addition and/or Alterations · FOR THE INSTALLATION OF HVAC APPLIANCES, EQUIPMENT, DUCTWORK AND REGISTERS/DIFFUSERS TO THE 31ST FLOOR OF AN EXISTING STRUCTURE PER APPROVED PLANS AND MANUFACTURER'S SPECIFICATIONS. *2018 IMC REVIEW*
- Issued Sep 17, 2025
Addition and/or Alterations · EZ PERMIT DUCTWORK & WARM-AIR APPLIANCES - For the installation of New Ductwork, Registers/Grilles/Diffusers, and Warm-Air Appliances as per attached standards. Deviations from these standards require submission of construction and site plans. Relocate [2] thermostats, relocate [10] diffusers, and provide air balance.
- Issued Sep 15, 2025
Alterations · For minor construction work at the subject property in accordance with all applicable provisions of the Philadelphia Code, all references codes and standards, and the attached EZ Standard, where included. Deviation from this standard shall result in permit revocation. A separate permit from the Philadelphia Department of Streets is required for any sidewalk and street closures. All means of pedestrian protection required at the site in accordance with the Philadelphia Building Code Chapter 33 sh
- Issued Sep 11, 2025
Addition and/or Alterations · EZ PERMIT SPRINKLER RELOCATION (NFPA 13)- For the relocation of sprinkler heads as per attached standards. Deviations from these standards require submission of construction and site plans. Relocate (19) diffusers in the first floor lobby and provide air balance report.
- Issued Sep 10, 2025
Addition and/or Alterations · EZ PERMIT DUCTWORK & WARM-AIR APPLIANCES - For the installation of New Ductwork, Registers/Grilles/Diffusers, and Warm-Air Appliances as per attached standards. Deviations from these standards require submission of construction and site plans. Relocate [2] thermostats, relocate [6] diffusers, and provide air balance report in suite 2610
- Issued Aug 27, 2025
Addition and/or Alterations · FOR THE INSTALLATION OF HVAC APPLIANCES, EQUIPMENT, DUCTWORK AND REGISTERS/DIFFUSERS TO PART OF 4TH FLOOR OF AN EXISTING STRUCTURE PER APPROVED PLANS AND MANUFACTURER'S SPECIFICATIONS. *2018 IMC REVIEW*
- Issued Aug 21, 2025
Addition and/or Alterations · FOR THE INSTALLATION OF REGISTERS / DIFFUSERS CONNECTED TO DUCT WORK TO BE INSTALLED IN ACCORDANCE WITH THE MANUFACTURER’S SPECIFICATIONS. FOR USE AS PREVIOUSLY APPROVED. ALL WORK TO BE DONE PER APPROVED PLANS. IF FIELD CONDITIONS VARY CONTACT DESIGN ENGINEER PRIOR TO THE START OF ANY WORK. SEPARATE PERMITS TO BE OBTAINED FOR ALL OTHER WORK.
- Issued Aug 15, 2025
Addition and/or Alterations · FOR THE INSTALLATION OF HVAC APPLIANCES, GRDs, AND ASSOCIATED DUCTWORK AT THE 24TH AND 25TH FLOORS AS PER APPROVED PLANS AND IN ACCORDANCE WITH 2018 IMC. SEPARATE PERMITS TO BE OBTAINED FOR ALL OTHER WORK. SEE CP-2025-001726 FOR ASSOCIATED BUILDING PERMIT.
- Issued Aug 8, 2025
Addition and/or Alterations · FOR THE INSTALLATION OF HVAC APPLIANCES, EQUIPMENT, DUCTWORK AND REGISTERS/DIFFUSERS TO AN EXISTING TENANT SPACE (SUITE #400) PER APPROVED PLANS AND MANUFACTURER'S SPECIFICATIONS. *2018 IMC REVIEW*
- Issued Aug 5, 2025
Alterations · For minor construction work at the subject property in accordance with all applicable provisions of the Philadelphia Code, all references codes and standards, and the attached EZ Standard, where included. Deviation from this standard shall result in permit revocation. A separate permit from the Philadelphia Department of Streets is required for any sidewalk and street closures. All means of pedestrian protection required at the site in accordance with the Philadelphia Building Code Chapter 33 sh
- Issued Aug 4, 2025
Addition and/or Alterations · FOR THE INSTALLATION OF HVAC APPLIANCES, GRDs, EXHAUST FAN, AND ASSOCIATED DUCTWORK AS PER APPROVED PLANS AND IN ACCORDANCE WITH 2018 IMC. SEPARATE PERMITS TO BE OBTAINED FOR ALL OTHER WORK. SEE CP-2024-005848 FOR ASSOCIATED BUILDING PERMIT.
- Issued Jul 31, 2025
Addition and/or Alterations · FOR THE INSTALLATION OF REGISTERS, DIFFUSERS, AND APPLIANCES WITH ASSOCIATED DUCTWORK. APPLIANCES TO BE INSTALLED IN ACCORDANCE WITH THE MANUFACTURER’S SPECIFICATIONS. FOR USE AS PREVIOUSLY APPROVED. ALL WORK TO BE DONE PER APPROVED PLANS. IF FIELD CONDITIONS VARY CONTACT DESIGN ENGINEER PRIOR TO THE START OF ANY WORK. SEPARATE PERMITS TO BE OBTAINED FOR ALL OTHER WORK.
- Issued Jul 28, 2025
Alterations · • Furnish and install [8] Exam Room Sinks • Provide labor and materials to extend from existing sanitary, vent and domestic cold as shown.
- Issued Jul 24, 2025
Addition and/or Alterations · FOR THE INSTALLATION OF REGISTERS, DIFFUSERS TO BE INSTALLED IN ACCORDANCE WITH THE MANUFACTURER’S SPECIFICATIONS. FOR USE AS PREVIOUSLY APPROVED. ALL WORK TO BE DONE PER APPROVED PLANS. IF FIELD CONDITIONS VARY CONTACT DESIGN ENGINEER PRIOR TO THE START OF ANY WORK. SEPARATE PERMITS TO BE OBTAINED FOR ALL OTHER WORK.
- Issued Jul 16, 2025
Addition and/or Alterations · FOR A NEW MECHANICAL WORK. ALL WORK TO BE DONE PER APPROVED PLANS. IF FIELD CONDITIONS VARY CONTACT DESIGN ENGINEER PRIOR TO THE START OF ANY WORK. SEPARATE PERMITS REQUIRED FOR ALL OTHER WORK.
- Issued Jul 16, 2025
Alterations · • Furnish and install [2] Pantry Sinks, [1] Electric Water Heater, [1] Floor Drain and [1] Hub Drain • Provide labor and materials to extend from existing sanitary, vent and domestic water.
Track this owner
We'll flag their next deal, permit, or filing — usually before the neighbors know.
Entities are grouped by a normalized name from the public record; a separate legal entity per building is common, so some portfolios span several related names. Sources: Phila. Dept. of Records (deeds), L&I (permits & violations), Dept. of Revenue (tax delinquencies), reflecting the record as of our last weekly ingest. Verify independently before relying on it.
Last generated August 1, 2026.